Tungsteel Day 7
- wataugarobotics
- Dec 18, 2018
- 1 min read
Date: 10.16.2018
Goals
Finish drivetrain
Rebuild base
Attach and gear wheels
Add drive-motors
Brainstorm outreach
Finalize parts-to-buy list
What Happened:
Rebuilt the robots base
Attached Wheels (all 6)
Geared wheels so we only need two motors to drive the robot
What Didn’t Happen:
Outreach brainstorming
Adding the drive motors
Finalize parts-to-buy list
Summary:
Although not all goals were accomplished today, it was quite successful over all. We realized that the base of the robot had been accidentally changed in a way that needed to be fixed, so that is what we started with. After that, we continued on to adding the wheels with 3 on each side and in a tank drive configuration. We attempted to gear them together so that we would only need 2 motors for the drivetrain, but encountered some issues while building. Mainly, there is too much friction between all of the wheels. We hope to troubleshoot this in the next meeting so that we can use the other motors for the mechanisms instead of the drivetrain.
All of the previous work took more time than expected, making it so that we could not complete some of the things we desired, such as brainstorming for outreach ideas. We hope to get to these unfinished tasks in our next meeting.
Next Time:
Add drive motors
Brainstorm outreach
Begin work on cube grabbing mechanism