top of page
Search

Rebuilding: Meeting Overview

Hits

  • Programming:

  • Programming team has transferred to building

  • Built drive base on seperate robot with vex omni wheels

  • Holo x drive programmed for seperate robot

  • Building:

  • Revised/disassembled robot to incorporate mecanum wheels

  • The building team is in the process of redoing the drive system for the first FTC robot

Misses

  • Programming:

  • Needed to rebuild the base of the second robot, because the first prototype base was not sufficient

  • Building:

  • Drive system did not work for getting up on ramp at the last qualifier, so the building team needed to disassemble the base and rethink their strategy

Goals

  • Programming:

  • Get the base and arm attached to second robot by this weekend

  • Building:

  • Have the base rebuilt and get robot driving again by the end of next meeting

State of Robot

In the process of being disassembled and the drive system being rebuilt for the first FTC robot.

 
 
 

Comments


  • facebook
  • generic-social-link

©2018 by Watauga Robotics

bottom of page